KSEBOA - KSEB Officers' Association

Monday
Mar 15th
Text size
  • Increase font size
  • Default font size
  • Decrease font size
Home News Power Sector News PSEB increases load shedding by an hour from existing 4-5 hours

PSEB increases load shedding by an hour from existing 4-5 hours

smaller text tool iconmedium text tool iconlarger text tool icon
PSEBPunjab State Electricity Board (PSEB) has increased the duration of load shedding from existing four to five hours due to reduction in hydel generation by over 50%. Heavy snowfall in the hills has led to steep fall in hydel power generation with a few hydel stations having stopped functioning altogether. Consequently, the load sheddings were increased by an hour. As per the information available, the total hydel power which Punjab was getting on daily basis was to the tune of 97 kah units (LUs), which has now decreased to 50 LUs only. Thus to make up for the loss in power supply, load shedding have been increased.

It needs to be mentioned that while Ludhiana is struggling with five-hour shedding, many cities like Patiala, Bhatinda, Jalandhar etc are facing only four-hour shedding. Ludhiana was getting 4 hours load shedding earlier which has now been increased to 5 hours while in the rest of the cities duration has been increased from 3 hours to 4 hours.

The load shedding can further increase if hydel generation further dips and also load increases due to usage of more heaters etc. So far, no weekly off has been imposed on industry, but agriculture sector is getting dedicated supply of about 6 hours. Sources revealed that wheat crop does not need much water in this weather, but still supply of six hours is being given by imposing cuts on domestic sector of urban as well as rural areas.

Apart from this, even the local faults due to moisture in the conductors or fuse box etc are also occurring in the polluted areas, resulting more power interruptions. The kite strings are another cause of electricity faults which are happening in many areas, said officials.

The availability of power is around 790LUs after giving the banking supply while demand is of more than 900 LUs and hence to cover up the gap, load sheddings are being imposed, said officials.

Spokesperson of PSEB, Ludhiana, Pardeep Gupta however said, “The load sheddings are being imposed as per the frequency available so that the system doesn’t trip. Anyway in winter, weathering load shedding — which are not of very long duration — is not a tall order.”


Source - Indian Express
Comments (0)Add Comment
Write comment
 
  smaller | bigger
 

security image
Write the displayed characters


busy
 
Follow us on Twitter
Banner
Latest Downloads
Promtion of SA to SS - Order Dated 15-03-2010
Promotion of Fair copy assistants to Fair copy superintendents Dated 15-03-2010
Promotion of SE(Ele) to AE(Ele) under Diploma Quota Dated 12-03-2010
PSC advice list for 74 nos AE(Ele) in KSEBoard
Free software for preparation of TA Bills of KSEB Officers
KSEBOA News Magazine February 2010
Guidlines for effecting service connections- BO Dated 24-02-2010
KSEBOA News Magazine January 2010
KSEBOA News Magazine December 2009
Free Software for preparation of Income Tax statement, ITR for 2009-10 for senior citizens
THE FOLLOWING TRAN. AND POSTINGS OF AEE(E) DTD.31.12.09
CORR. IN THE PRO. AND POST. OF AE(E) TO AEE(E) DTD.31.12.09
PRO. AND POST. OF AEE(E) TO EE(E) AND TRA.EE(E) DTD.30.12.09
Pro. and Posting. of EE(E) to DYCE(E) dtd.11.12.2009
TRANSFER AND POSTINGS OF AEE(E) ORDER DTD.08.12.2009
Latest News
Popular Downloads
Study report on LT Billing computerisation in KSEB 4775
Power Quiz Sample Questions 4168
Free Software for preparation of Income Tax statement, Form-16, ITR-1, ITR-2 for 2009-10 3989
Free Software for preparation of Income Tax statement for 2008-09 2510
KSEB General Transfer - Application format for officers 1704
Study report on Power sector private participation in Kerala 1694
PSC Rank List of AE(Ele) including addentum dated 07-07-2009 1632
Free Software for preparation of MASA 1350
Free Software for preparation of work bills 1173
Free Software for Preparation of Estimates using Open office 1096
KSEB Transfer Scheme - Kerala Gazette Notification No-2090 Dated 25-09-2008 1027
Free Software for 11KV Voltage regulation calculation and preparation of VR chart 975
CUG Mobile Telephone Numbers of KSEB Offices/ Officers 973
Convert numeric value to English words for MS Excel and Open office calc 768
Traiff for retail supply by KSEB wef 01-12-2007 646
Popular News
Malayalam News
Breaking News
Videos

Reference Book

 

Reference Book on Power Vol-I

Electrical Engineering-- D' 1/4 Size Hard bound-- 1424 Pages-- Just Rs.1000/- only    ...

 

Reference Book on Power Vol-II

Civil Engineering & General-- D' 1/4 Size Hard bound-- 1144 Pages-- Just Rs.700/- only...
CAREER DEVELOPMENT PROGRAMMES

1. Interpersonal relationship and stress management at Kannur on 20-3-2010 at 10 AM- Faculty Dr Chandraprasad Sridhar, Professor (Rtd), IMG Kerala.
2. One day session on Intellectual openness at Palakkad on 18-04-2010 at 10 AM Faculty Dr Raman Nair, Director, SCMS, Cochin
3. SCADA for Power Utilities at Ernakulam on 27-04-2010 at 11 AM Faculty M Narendran GE Energy, Bangalore
4. For new PSC recruitees Classes on departmental test at Kannur, Kozhikode, Malappuram, Thrissur, Ernakulam, Idukki and Moozhiyar in the month of May and June 2010. Register your name with District Secretary.

Registered Users

Total Members : 4922
Latest Member : praveen1810
Today : 0 Registers
This Week : 0 Registers
This Month : 46 Registers

Visitor Statistics

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday1813
mod_vvisit_counterYesterday1808
mod_vvisit_counterThis week3621
mod_vvisit_counterLast week16041
mod_vvisit_counterThis month33115
mod_vvisit_counterLast month58847
mod_vvisit_counterAll Days2437786

Visitors Online Now : 52
Your IP: 38.107.191.110
,
Today: Mar 15, 2010