KSEBOA - KSEB Officers' Association

Friday
Mar 12th
Text size
  • Increase font size
  • Default font size
  • Decrease font size
Home News Power Sector News Centre ask to surrender NTPC’s coal block to Reliance

Centre ask to surrender NTPC’s coal block to Reliance

smaller text tool iconmedium text tool iconlarger text tool icon

NTPC Coal based power projects will be hit badly as it's coal blocks are transfered to RelianceNational Thermal Power Corporation(NTPC) was asked to surrender the Chhatrasal coal block to Reliance Infrastructure( Formerly Known as Reliance energy) on the premise that there was limited coal availability for the 3,960MW Sasan Ultra Mega Power Project in Madhya Pradesh- Wall street journal reported on 07-11-2008. With three blocks in its fold, the Sasan project’s total coal reserves now stand at 750 million tonnes. On 13 August this year, an empowered group of ministers allowed Reliance Power to use surplus coal from captive mines allocated for the Sasan project for other projects being developed by it or its affiliates. This means the company can use the coal for its 3,960MW plant project at Chitrangi, also in Madhya Pradesh.

The 4,000MW project in Madhya Pradesh had been earlier alloted two coal blocks-Moher and Moher-Amlori Extension in late 2006 in addition to the Chhatrasal block it took away from NTPC.

Reliance Power, controlled by Anil Ambani, has agreed to sell power generated at Sasan at Rs1.19 a unit, while it plans to sell power generated at Chitrangi at Rs2.45 a unit.

To be sure, NTPC was asked to give up the coal block before the project was awarded. Initially, the Sasan project was awarded to a consortium headed by Lanco Infratech Ltd. However, this group was subsequently disqualified for violating bidding norms and the project awarded to Reliance Power on the condition that it match Lanco’s bid.

According to documents prepared for the consideration of the ministerial group, while the power ministry had asked for an additional coal block in October 2006, the block was allocated in the same month to Power Finance Corp. Ltd-the nodal agency for the award of projects with installed capacity of at least 4,000MW.

The ministerial meeting of 13 August 2008 was the first one held after the 22 July trust vote the ruling United Progressive Alliance coalition at the Centre won, largely thanks to support from the Samajwadi Party, whose leader Amar Singh is considered to be close to Anil Ambani.

The 3960 MW project of Sasan Power Limited has been started in a nearby area of Sasan village which is under the Singrauli Tehsil of Sidhi district in Madhya Pradesh. Initially the project was under the control of Power Finance Corporation Limited. However, through a bidding procedure done on international levels, the project was bagged by the Reliance Power in the year 2007.

The site of the project covers around 3500 hectares of land. The Rihand Reservoir located at a distance of about 7 km from the Power Project is a major source of water supply. The Singrauli Coal fields have several integrated blocks that help in transportation of coal to the project site. Ruhella, Mohar, Bundela, Nigahi and Mehrauli blocks, all of which are about 25 km from Sasan Power Limited project, are supposed to supply the needed coal for the power generation.

Courtsey- Wallstreet Journal

Comments (0)Add Comment
Write comment
 
  smaller | bigger
 

security image
Write the displayed characters


busy
 
Follow us on Twitter
Banner
Latest Downloads
PSC advice list for 74 nos AE(Ele) in KSEBoard
Free software for preparation of TA Bills of KSEB Officers
KSEBOA News Magazine February 2010
Guidlines for effecting service connections- BO Dated 24-02-2010
KSEBOA News Magazine January 2010
KSEBOA News Magazine December 2009
Free Software for preparation of Income Tax statement, ITR for 2009-10 for senior citizens
THE FOLLOWING TRAN. AND POSTINGS OF AEE(E) DTD.31.12.09
CORR. IN THE PRO. AND POST. OF AE(E) TO AEE(E) DTD.31.12.09
PRO. AND POST. OF AEE(E) TO EE(E) AND TRA.EE(E) DTD.30.12.09
Pro. and Posting. of EE(E) to DYCE(E) dtd.11.12.2009
TRANSFER AND POSTINGS OF AEE(E) ORDER DTD.08.12.2009
KSEB Promotions of AE(Ele) to AEE(Ele) Degree Quota dated 08-12-2009
KSEB Promotions of AE(Ele) to AEE(Ele) Diploma Quota dated 08-12-2009
KSEBOA News Magazine November 2009
Latest News
Popular Downloads
Study report on LT Billing computerisation in KSEB 4774
Power Quiz Sample Questions 4168
Free Software for preparation of Income Tax statement, Form-16, ITR-1, ITR-2 for 2009-10 3286
Free Software for preparation of Income Tax statement for 2008-09 2510
KSEB General Transfer - Application format for officers 1704
Study report on Power sector private participation in Kerala 1692
Free Software for preparation of MASA 1346
Free Software for preparation of work bills 1169
Free Software for Preparation of Estimates using Open office 1093
KSEB Transfer Scheme - Kerala Gazette Notification No-2090 Dated 25-09-2008 1027
CUG Mobile Telephone Numbers of KSEB Offices/ Officers 973
Free Software for 11KV Voltage regulation calculation and preparation of VR chart 972
Traiff for retail supply by KSEB wef 01-12-2007 645
PSC Rank List of AE(Ele) including addentum dated 07-07-2009 632
Service Connection Procedure in KSEB 538
Popular News
Malayalam News
Breaking News
Videos

Reference Book

 

Reference Book on Power Vol-I

Electrical Engineering-- D' 1/4 Size Hard bound-- 1424 Pages-- Just Rs.1000/- only    ...

 

Reference Book on Power Vol-II

Civil Engineering & General-- D' 1/4 Size Hard bound-- 1144 Pages-- Just Rs.700/- only...
CAREER DEVELOPMENT PROGRAMMES

1. Interpersonal relationship and stress management at Kannur on 20-3-2010 at 10 AM- Faculty Dr Chandraprasad Sridhar, Professor (Rtd), IMG Kerala.
2. One day session on Intellectual openness at Palakkad on 18-04-2010 at 10 AM Faculty Dr Raman Nair, Director, SCMS, Cochin
3. SCADA for Power Utilities at Ernakulam on 27-04-2010 at 11 AM Faculty M Narendran GE Energy, Bangalore
4. For new PSC recruitees Classes on departmental test at Kannur, Kozhikode, Malappuram, Thrissur, Ernakulam, Idukki and Moozhiyar in the month of May and June 2010. Register your name with District Secretary.

Registered Users

Total Members : 4912
Latest Member : sjvazir
Today : 1 Registers
This Week : 13 Registers
This Month : 37 Registers

Visitor Statistics

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday1858
mod_vvisit_counterYesterday2277
mod_vvisit_counterThis week12236
mod_vvisit_counterLast week14932
mod_vvisit_counterThis month25689
mod_vvisit_counterLast month58847
mod_vvisit_counterAll Days2430360

Visitors Online Now : 54
Your IP: 38.107.191.111
,
Today: Mar 12, 2010