KSEBOA - KSEB Officers' Association

Saturday
Mar 13th
Text size
  • Increase font size
  • Default font size
  • Decrease font size
Home News Power Sector News Power sector PSUs to set up power equipment testing facility

Power sector PSUs to set up power equipment testing facility

smaller text tool iconmedium text tool iconlarger text tool icon
Power Equipment TestingFour Central public sector undertakings — National Thermal Power Corporation (NTPC), National Hydro Power Corporation (NHPC), Power Grid Corporation of India (PGCIL) and Damodar Valley Corporation (DVC) — signed an agreement to set up a high power testing laboratory for testing equipment as per world standards.In an attempt to cut down the delays in power projects caused by the lack of a proper equipment testing facility in India, the power ministry has got four Public Sector Undertakings (PSUs) to form a joint venture to set up a domestic testing facility.

The facility will require an investment of around Rs 200 crore and the four PSUs — NTPC, NHPC, PowerGrid and DVC — will contribute equally in the venture.

“The joint venture company will be incorporated by the month-end,” said RS Sharma, chairman and managing director of NTPC Ltd, the country’s largest power generator.

At a time when the demand for power in India is projected to rise to 1,000 billion units (BUs) by 2012, as against 730 BUs at present, the country does not have a higher-range testing facility for power equipment like transformers. Manufacturers like state-run Bharat Heavy Electronics Ltd (BHEL) have to send their equipment to the Netherlands for testing.

This process, experts say, delays transmission projects where transformers form an integral part of the system. India plans to triple its inter-regional power transmission capacity in the current Plan period ending March 2012.

“The unavailability of a testing facility for transformers can severely impact the transmission targets for the current Plan period,” said K Ravi Kumar, chairman and managing director, BHEL, one of the largest manufacturers of power transformers in India, which occupies about 40 per cent of the domestic power transformer market.

Transformers play a key role in maintaining the voltage level in transmission, which in turn affects the power available to consumers. While Indian manufacturers like BHEL are manufacturing power transformers of up to 400 kilovolt (Kv) class, a shift to the planned higher 800 kv class transformers will require adequate testing facilities too.

With the new testing facility coming up soon, the ministry expects to fast-track its plans for laying down adequate transmission infrastructure with the help of the four PSUs.

At present, all high-capacity transformers installed in India — above 90 Milli Volt Ampere (MVA) rating — are sent to KEMA, the Netherlands-based electrical equipment testing organisation, before being commissioned. This, however, leads to an average delay of 5-9 months in the commissioning schedule, according to Kumar.

India’s only testing facility at the Central Power Research Institute (CPRI) can only be used for routine testing of transformers. “Our transformer testing facilities are limited only to 90 MVA levels,” said PK Kognolkar, director general CPRI.

India’s ambitious plans to ramp up its power generation capacity multi-fold to cope with the average 14 per cent annual increase in the demand for power will require commissioning of higher-class transformers.



Source - Business standard
Comments (0)Add Comment
Write comment
 
  smaller | bigger
 

security image
Write the displayed characters


busy
 
Follow us on Twitter
Banner
Latest Downloads
Promotion of SE(Ele) to AE(Ele) under Diploma Quota Dated 12-03-2010
PSC advice list for 74 nos AE(Ele) in KSEBoard
Free software for preparation of TA Bills of KSEB Officers
KSEBOA News Magazine February 2010
Guidlines for effecting service connections- BO Dated 24-02-2010
KSEBOA News Magazine January 2010
KSEBOA News Magazine December 2009
Free Software for preparation of Income Tax statement, ITR for 2009-10 for senior citizens
THE FOLLOWING TRAN. AND POSTINGS OF AEE(E) DTD.31.12.09
CORR. IN THE PRO. AND POST. OF AE(E) TO AEE(E) DTD.31.12.09
PRO. AND POST. OF AEE(E) TO EE(E) AND TRA.EE(E) DTD.30.12.09
Pro. and Posting. of EE(E) to DYCE(E) dtd.11.12.2009
TRANSFER AND POSTINGS OF AEE(E) ORDER DTD.08.12.2009
KSEB Promotions of AE(Ele) to AEE(Ele) Degree Quota dated 08-12-2009
KSEB Promotions of AE(Ele) to AEE(Ele) Diploma Quota dated 08-12-2009
Latest News
Popular Downloads
Study report on LT Billing computerisation in KSEB 4775
Power Quiz Sample Questions 4168
Free Software for preparation of Income Tax statement, Form-16, ITR-1, ITR-2 for 2009-10 3288
Free Software for preparation of Income Tax statement for 2008-09 2510
KSEB General Transfer - Application format for officers 1704
Study report on Power sector private participation in Kerala 1694
Free Software for preparation of MASA 1347
Free Software for preparation of work bills 1169
Free Software for Preparation of Estimates using Open office 1095
KSEB Transfer Scheme - Kerala Gazette Notification No-2090 Dated 25-09-2008 1027
Free Software for 11KV Voltage regulation calculation and preparation of VR chart 974
CUG Mobile Telephone Numbers of KSEB Offices/ Officers 973
Traiff for retail supply by KSEB wef 01-12-2007 645
PSC Rank List of AE(Ele) including addentum dated 07-07-2009 632
Service Connection Procedure in KSEB 539
Popular News
Malayalam News
Breaking News
Videos

Reference Book

 

Reference Book on Power Vol-I

Electrical Engineering-- D' 1/4 Size Hard bound-- 1424 Pages-- Just Rs.1000/- only    ...

 

Reference Book on Power Vol-II

Civil Engineering & General-- D' 1/4 Size Hard bound-- 1144 Pages-- Just Rs.700/- only...
CAREER DEVELOPMENT PROGRAMMES

1. Interpersonal relationship and stress management at Kannur on 20-3-2010 at 10 AM- Faculty Dr Chandraprasad Sridhar, Professor (Rtd), IMG Kerala.
2. One day session on Intellectual openness at Palakkad on 18-04-2010 at 10 AM Faculty Dr Raman Nair, Director, SCMS, Cochin
3. SCADA for Power Utilities at Ernakulam on 27-04-2010 at 11 AM Faculty M Narendran GE Energy, Bangalore
4. For new PSC recruitees Classes on departmental test at Kannur, Kozhikode, Malappuram, Thrissur, Ernakulam, Idukki and Moozhiyar in the month of May and June 2010. Register your name with District Secretary.

Registered Users

Total Members : 4914
Latest Member : pssanthosh
Today : 0 Registers
This Week : 15 Registers
This Month : 39 Registers

Visitor Statistics

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday123
mod_vvisit_counterYesterday2636
mod_vvisit_counterThis week123
mod_vvisit_counterLast week15307
mod_vvisit_counterThis month26590
mod_vvisit_counterLast month58847
mod_vvisit_counterAll Days2431261

Visitors Online Now : 21
Your IP: 38.107.191.111
,
Today: Mar 13, 2010